Hebei Fengning Pumped Storage Power Station has a total installed capacity of 3,600MW, and the power station is developed in two phases, with the installed capacity of the first and second phases of the project being 1,800MW respectively. The hub building is mainly composed of the upper reservoir, the lower reservoir, the water transmission system of the first and second phases of the project, the underground plant and the switch station.
As of December 2023, 10 units of the power station have been put into operation. The remaining two units will also be commissioned in 2024. The 12 units installed in the power station have a total installed capacity of 3.6 million kilowatts, making it the world's largest installed capacity among pumped storage power stations. It is a pumped storage power station with weekly regulation performance, and its energy storage capacity is the first in the world.
Provide fire doors for the main and auxiliary engine rooms of the power station; The maximum height of the fire door in the computer room is 3000m. Meet the requirements of sound insulation, heat preservation and fire prevention for power station operation.
Provide a large form of fireproof glass partition for the main operation room of the power station, using high light transmittance and ultra-clear glass glass to ensure fire safety and clear operation vision.
Provide electric blinds for the exhaust area of the power station, and cooperate with the electric induction device to realize automatic opening or closing according to the temperature.
Panoramic View
Fire Door
Fire Partition
Motorized Louvered Door
Construction and property details | |
Property developer: | State GRID |
Architects: | Power China Railway Construction Group |
Execution | 2020 |
Total space: | 2092010 m² |
Height: | 54.5 m |
Floors | 21 |
Installed fire seals | |
Multipurpose steel doors | 211 |
Fire resistant doors | 837 |
Fire paititions | 4 |
Fire electric louvers | 45 |
Order value: | 92,0000 € |
Hardware: | GMT |
Installation period: | 38 months |
117, 1/F, Block 2, No. 11, South Banbidian Section, Litian Road, Shunyi District, Beijing, P.R. China
WinB 7th floor,Galana Plaza,Galana Rd, Nairobi
Seed Green (Beijing) Construction Technology Co., Ltd. Achieves European Union Trademark Registration
Seed Green (Beijing) Construction Technology Co., Ltd. Establishes New Branch in Kenya
Successful Engagement at the 15th IIFF: Our Overseas Business Department Secures Key International Partnerships